IVC Building 6600 Phase 2 & 3 – Main Structure

ERICKSON-HALL CONSTRUCTION CO. HAS BEEN SELECTED AS THE LEASE-LEASEBACK CONTRACTOR FOR THE IMPERIAL VALLEY COLLEGE BUILDING 6600 PHASE II – MAIN STRUCTURE Scope of work to include: Construction of new 33,360sf Auto/Diesel Truck Technology, Career Services, and Art Facility. Trades included but not limited to: Survey, SWPPP, Hazmat Abatement, Building Demolition, Site Demolition, Earthwork, Underground Utilities, Asphalt Paving, Ornamental Fencing/Gates, Concrete & Rebar, Polished Concrete, Masonry, Structural Steel, Open Web Steel Joists, Metal Fabrications, Steel Decking, Decorative Metal Railings, Cabinets & Countertops, Finish Carpentry, Waterproofing, Insulation, Aluminum Wall Panels, SBS Modified Bituminous Roofing, Sheet Metal, Gutters & Downspouts, Hollow Metal Doors & Frames, Wood Doors, Coiling Counter Doors, Rolling Service Doors, Aluminum Storefront & Curtainwall Systems, Glazing, Tubular Skylights, Door Hardware, Plaster, Metal Stud Framing & Gypsum Board, GFRC Panels, Ceramic Tile, Acoustic Ceilings, Metal Acoustic Ceilings, Flooring: Carpet Tiles-LVT-Rubber Base, Acoustic Wall Panels, Painting & Water Repellent Coatings, Visual Display Boards, Signage, Toilet Partitions & Accessories, FEC’s, Roll Down Blinds, Entrance Mats, Crane & Hoist, Vehicle Equipment, Fire Sprinklers, Plumbing, HVAC, Electrical, PhotoVoltaic, PV Canopies, Shade Canopy, Low Voltage Systems – Structured Cabling, Communications, VoiceIP Phone System, Assistive Listening, Clocks, Access Controls, Video Surveillance, Fire Alarm, Audio-Visual Equipment, Landscape & Irrigation, Site Furnishings (Trash Receptacles, Tree Grates, Bike Lockers, & Bike Rack).

Bid Information

Bid Date:

9/10/2024

Due:

2:00 PM

Contact:

Chris Bartok

Email:

cbartok@ericksonhall.com

Documents and Updates

Job Walk: August 28, 2024 @ 10:30 AM (non-mandatory) (trades that are strongly encouraged to attend are; asbestos/lead abatement, demolition, earthwork, masonry & MEP’s). Park near jobsite location.
Project Address: 380 E Aten Road, Imperial, CA 92251

Bid Date: September 10, 2024 @ 2:00 PM

RFI Deadline: September 4, 2024, submit to cbartok@ericksonhall.com Bid Documents can be obtained by contacting planroom@ericksonhall.com All bids are to be submitted to Erickson-Hall Construction Co. bids@ericksonhall.com
This project will have an Owner Controlled Insurance Program (OCIP) which all subcontractors will need to abide by the OCIP instructions.
EHCC is requesting bids from DVBE subcontractors and suppliers.

Washington MS Transformation – Increment 1

ERICKSON-HALL CONSTRUCTION CO. HAS BEEN SELECTED AS THE LEASE-LEASEBACK CONTRACTOR FOR THE WASHINGTON MIDDLE SCHOOL TRANSFORMATION – INCREMENT 1 Increment 1 of a comprehensive modernization of Washington Middle School in Long Beach including demolition of all buildings and site structures. Scope of work in this phase of the project includes, but not limited to: abatement of hazardous materials (asbestos, lead, universal waste), demolition (site and building), utility disconnect, salvage and rough grading and soils export. New utility service is NOT part of this bid. This project requires prequalification. Long Beach Unified School District requires all general contractors and all mechanical, electrical and plumbers (MEP) subcontractors utilizing any of the following licenses be prequalified with the District: General Contractors (A and B) and Subcontractors (C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46). Long Beach Unified uses QualityBidders (https://www.qualitybidders.com/) to manage prequalification.

Bid Information

Prequalification Deadline:

9/3/2024

Bid Date:

9/17/2024

Due:

2:00 PM

Contact:

Travis Miinch

Email:

travismiinch@ericksonhall.com

Documents and Updates

Prequalification Due: September 3, 2024
Job Walk: August 22, 2024 @ 9:00 AM (non-mandatory)
Project Address: 1450 Cedar Avenue, Long Beach, CA 90813

Bid Date: September 17, 2024 @ 2:00 PM

RFI Deadline: August 28, 2024, submit to travismiinch@ericksonhall.com Bid Documents can be obtained by contacting planroom@ericksonhall.com All bids are to be submitted to Erickson-Hall Construction Co. bids@ericksonhall.com
This project requires Prevailing Wage, Skilled & Trained Workforce This project requires prequalification. Long Beach Unified School District requires all general contractors and all mechanical, electrical and plumbers (MEP) subcontractors utilizing any of the following licenses be prequalified with the District: General Contractors (A and B) and Subcontractors (C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46). Long Beach Unified uses QualityBidders (https://www.qualitybidders.com/) to manage prequalification.

VESD Shade Structures (East Side – 9 Sites)

Bid No. 24-013 - East Side Shade Structures - 9 Sites. Scope: The installation of new shade structures at nine elementary school sites on the East Side of the district: Del Rey, Endeavour, Galileo, Green Tree, Irwin, Lomitas, Mountain View Montessori, Mojave Vista, and Sixth St. The project aims to enhance outdoor spaces by providing shaded areas, improving comfort and safety for students and staff as noted in the Contract Documents. The project includes an alternate to include umbrella structures at Montessori per the drawings included in the documents.

Bid Information

Bid Date:

8/26/2024

Due:

2:00 PM

Contact:

Abdull Najjar

Email:

anajjar@ericksonhall.com

Documents and Updates

**Addendum No. 1 issued August 21, 2024**

Job Walk (non-mandatory): August 14, 2024 @ 9:00 am
Project Address: A NON-MANDATORY JOB WALK has been scheduled for this project. This job walk will be held Wednesday, August 14, 2024 at 9:00 A.M. beginning at Galileo ES (first project site) located at 15999 Warwick St., Victorville, CA 92395.

Bid Date: August 26, 2024 @ 2:00 pm

Bid Documents can be obtained through Procore or if access is needed, by contacting Abdull Najjar anajjar@ericksonhall.com
See Section “Instruction for Bidders” included in the Contract Documents.
Erickson-Hall Construction provides notice to all contractors of the adoption of SB 854, this requires subcontractors to comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/PublicWorks/publicworks.html SB 854 requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015), unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

VESD Shade Structures (West Side – 9 Sites)

Bid #24-017 – West Side Shade Structures – 9 Sites. Scope: The installation of new shade structures at nine elementary school sites on the West Side of the district: Brentwood, Challenger, Discovery, Liberty, Park View, Puesta Del Sol, Ralph Baker 21, Village and West Palms. The project aims to enhance outdoor spaces by providing shaded areas, improving comfort and safety for students and staff as noted in the Contract Documents.

Bid Information

Bid Date:

8/22/2024

Due:

2:00 PM

Contact:

Abdull Najjar

Email:

anajjar@ericksonhall.com

Documents and Updates

**Addendum No. 1 issued August 19, 2024**

Job Walk (non-mandatory): August 6, 2024 @ 9:00 am
Project Address: A NON-MANDATORY JOB WALK has been scheduled for this project. This job walk will be held Tuesday, August 6, 2024 at 9:00 A.M. beginning at Brentwood ES (first project site) located at 13962 Hook Blvd., Victorville, CA 92394.

Bid Date: August 22, 2024 @ 2:00 pm

Bid Documents can be obtained through Procore or if access is needed, by contacting Abdull Najjar anajjar@ericksonhall.com
See Section “Instruction for Bidders” included in the Contract Documents.
Erickson-Hall Construction provides notice to all contractors of the adoption of SB 854, this requires subcontractors to comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/PublicWorks/publicworks.html SB 854 requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015), unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

Rancho Bernardo HS Chiller Replacement REBID

ERICKSON-HALL CONSTRUCTION CO. HAS BEEN SELECTED AS THE LEASE-LEASEBACK CONTRACTOR FOR THE REBID-RANCHO BERNARDO HS CHILLER REPLACEMENT PROJECT Scope of work to include: Replace existing central utility plant equipment including the heating hot water boilers, chillers, cooling towers and pumps. New chilled and heating hot water piping distribution system. Construction of steel support structures, covered walkways, and flatwork/landscape repairs to route pipes to point of connections.

Bid Information

Prequalification Deadline:

7/26/2024

Bid Date:

8/13/2024

Due:

2:00 PM

Contact:

Emiliano Springer

Email:

espringer@ericksonhall.com

Documents and Updates

Prequalification Deadline: July 26, 2024
Job Walk (non-mandatory): July 16, 2024 @ 8:00 am
Project Address: 13010 Paseo Lucido, San Diego, CA 92128

Bid Date: August 13, 2024 @ 2:00 pm

RFI’s Due: July 26, 2024 @ 2:00 pm, submit to Emiliano Springer espringer@ericksonhall.com Bid Documents can be obtained by contacting planroom@ericksonhall.com All bids are to be submitted to Erickson-Hall Construction Co. bids@ericksonhall.com
This project requires Prevailing Wage, and Skilled & Trained Workforce.
This project requires prequalification. Poway Unified School District requires General Contractors and certain subcontractors to be prequalified on all bond-funded Construction Contracts. The following license classifications must prequalify: A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C-46.
Poway Unified School District uses PQBids (www.pqbids.com) to manage AB 1565 contractor registration and approvals.